Project Management
Purpose
This document defines the end-to-end project management lifecycle for website and web-app development at Wraptron Apptech LLP. It provides phase-by-phase requirements and procedures to ensure predictable, high-quality deliveries.
Definitions & Glossary
- Deliverable: A tangible output (e.g., sitemap, Figma files, deployed site).
- MVP: Minimum Viable Product — smallest set of features that delivers value.
- SLA: Service Level Agreement for uptime, support response times.
- Change Request (CR): Formal change to scope, timeline, or cost
Process flow
PHASE 0: Definition - Understanding Business Requirement
Business Requirement
- Understand the business goals, success metrics, constraints, timeline and budget.
- Document purpose,scope of work, target audience, assumptions and risks.
- Identify the required pages (Home, Services, Contact, About, etc.) and core features.
- Capture functional requirements (e.g., login, cart, forms, events).
- Capture non-functional requirements (performance, uptime, security, compliance).
- Identify hosting preferences and third-party integrations.(e.g., managed vs self hosted, uptime, performance).
Technical Requirement
- Define the proposed technology stack.
- Initial Sitemap and page list.
- High-level feature list and priority (Must/Should/Could/Won’t).
- Rough effort Estimate based on the number of pages, users and functionality.
Acceptance Criteria
- Stakeholder sign-off on BRD.
PHASE 1: Project Planning
Project Planning
- Break down projects into tasks and milestones (Epics → Stories → Tasks).
- Assign owners, estimate effort and set deadlines.
Content Collection
- Collect all content and branding assets such as logo, business plan, process maps, brochure, old website, presentations, photos etc.
Prepare Phase 1 Deliverables
- Project Plan (Gantt/roadmap) with milestones.
- Task board (e.g., GitHub Projects, Jira, Trello) with assigned tasks.
- Checklist for Content collection, Onboarding for new team members.
- Feasibility report and stakeholder sign-off.
Check for feasibility
- Confirm technical feasibility and resource availability.
- Finalize stakeholder approval before moving forward.
- Final stakeholder approval to proceed.
PHASE 2: User Experience Design
- Define Navigation,menu with Sitemap with URL structure
- Define Typography - Text hierarchy, Color Palette and iconography.
- Icons, Graphic & text-based content.
- Define layout structures for key pages (Homepage, Dashboard, Apphome etc,.).
User Journey Map
- Define the target audience
- Create user personas and journey maps for primary tasks (e.g., purchase, signup, contact).
Wireframe, User Interface Design (if required)
- Create wireframes/mockups for key templates.
- High-fidelity mockups in Figma (or lovable).
- Design responsive UI components (based on tasks like “UI Design for Cart”, “Services Section”, etc.).
Create creative content and media (if required)
- Draft copy per page and calls-to-action.
- Create or source imagery, illustrations and videos.
Prepare Phase 2 Deliverables
- Personas and user journeys.
- Sitemap and navigation map.
- Design system or component library (colors, typography, spacing, components).
- Wireframes and Figma prototypes (desktop, tablet, mobile).
- Content drafts and media assets.
Acceptance Criteria
- Usability sign-off from stakeholders.
PHASE 3: Software Development
Setting Up the Development Environment
- Choose tech stack for frontend, backend, database and system (e.g. Astro, Next.js using react or svelte, Node/Deno with postgres or mongodb ).
- Set up version control system on GitHub and local environment (VS Code, terminal).
- Create repositories and branch strategy (main, develop, feature/, release/, prod).
- Setup CI/CD pipelines and environment provisioning (dev/staging/prod) with Environment matrix (dev/staging/prod, credentials required)..
- Set up build tools, linters, code formatters and other dependencies.
- Document environment variables and secrets handling.
Frontend Application Development
- Implement responsive layouts and components with HTML, CSS, JavaScript.
- Implement client-side interactions and form validations.
- Backend Application Development (if required)
- Design database schema and models (Postgres, MongoDB, Neo4j as applicable).
- Build APIs for dynamic features (contact forms, carts, events).
- Implement functions such as authentication, role-based access control and sessions.
Database System Engineering
- Create Data abstraction and data models with ER Diagrams.
- Setting up Databases with database script or migration script.
- Seed database with staging data
- Develop User Access Management model.
Network System Engineering
- Provision infrastructure (CDN, DNS, TLS), logging, error tracking and monitoring.
Acceptance & Pre-Production plan
- Conduct client UAT on staging; log feedback as tickets with priority.
- Resolve critical and high-priority items before scheduling production deployment.
- Prepare deployment runbook and rollback plan.
PHASE 4: Quality Control and Assurance
Quality Assurance
- Define test cases and test plans (functional, regression, security, performance).
- Manual QA on supported browsers and devices.
- Automated testing: unit tests and integration tests.
- Accessibility testing (WCAG checks, keyboard nav, ARIA roles).
- QA test reports and bug tracker (with severity & reproduction steps).
- Test coverage reports.
Acceptance Criteria
- No critical or high severity open defects.
- Accessibility issues logged and mitigated to agreed level.
PHASE 5: Deployment
Release
- Configure domain, HTTPS (Let’s Encrypt/CA), and DNS records.
- Configure CDN, caching headers and Cloudflare as needed.
- Set up logging and error tracking (Sentry, LogRocket, etc.).
- Setup CI/CD pipelines on platforms like Cloudflare or AWS hosting.
Post-Launch Monitoring
- Ensure uptime, analytics tracking, and error logging.
PHASE 6: Automation & Optimization
- Optimize images, implement lazy loading, test responsiveness and caching strategies.
- Run Lighthouse audits and iterate on improvements.
SEO Setup (if required)
- Implement SEO basics: titles, meta descriptions, structured data, canonical tags.
- Configure Google Analytics / GA4 and Search Console.
Mobile Responsiveness
- Check for mobile responsive web pages
Documentation
- Standard operating procedure, Work Instruction
PHASE 7: Maintenance & Sustain
Security & Bug Fixes
- Monitor logs, uptime and security alerts, patch vulnerabilities, backup.
- Apply security patches and dependency updates.
Change Request
- Handle change requests via formal CR process and impact analysis.
- Content updates and feature additions as requested (e.g. dynamic cart, admin panels, newsletter updates).
- Regular additions: events, gallery, testimonials.
Maintenance
- Maintenance schedule and preventive maintenance checklist.
TL;DR — Wraptron’s 7-Phase Software Application Development Process
At Wraptron, we follow a structured 7-phase project management lifecycle to ensure smooth, high-quality, and on-time delivery:
-
Definition – Understand client goals, scope, audience, and requirements (both functional & technical).
-
Planning – Break down tasks, set milestones, gather content, and confirm feasibility.
-
Design – Create sitemaps, user journeys, wireframes, UI designs, and content drafts.
-
Development – Build frontend & backend, set up databases, integrate APIs, and prepare staging environment.
-
Quality Assurance – Test functionality, performance, security, and accessibility.
-
Deployment – Launch with proper domain, hosting, HTTPS, and monitoring.
-
Maintenance – Handle updates, bug fixes, security patches, and change requests.
This process ensures every Wraptron project is well-planned, user-focused, technically sound, and future-ready.